Step-by-Step Guide to Lawn Turf Installation in South Wales
Creating a beautiful, lush garden lawn starts with proper turf installation. At A1 Orchard Landscaping, we specialise in lawn turfing services across South Wales, ensuring that every step of the process is handled professionally for the best results. Hereβs a clear step-by-step guide to how we install turf lawns.
Step 1: Site Preparation
Good preparation is key to a healthy lawn. We begin by clearing away old grass, weeds, and debris. The ground is then rotavated and levelled to create an even surface, with additional topsoil added if needed.
Step 2: Soil Improvement
Healthy turf needs healthy soil. We apply high-quality topsoil and fertiliser to provide the best growing environment. This ensures strong root growth and a long-lasting lawn.
Step 3: Measuring and Ordering Turf
We accurately measure your garden to calculate how much turf is needed. At A1 Orchard Landscaping, we only use fresh, premium-grade turf for the best finish.
Step 4: Laying the Turf
The turf is laid in a staggered, brickwork pattern to avoid visible seams. Each roll is pressed firmly into place and edges are trimmed neatly to fit the garden layout.
Step 5: Watering the Lawn
Freshly laid turf requires thorough watering. We ensure the turf is soaked right after installation and advise you on a watering schedule to encourage deep rooting.
Step 6: Rolling and Finishing Touches
A roller is used to press the turf into the soil, removing air pockets and ensuring even contact. This helps with root establishment and provides a smooth, level finish.
Step 7: Aftercare Advice
We provide detailed aftercare instructions, including mowing, watering, and fertilising tips, so your new lawn stays green and healthy. Contact us today for a free turfing quote and let us create the perfect lawn for your home.
FAQs β Lawn Turf Installation in South Wales
How long does it take to lay turf?
A typical garden can be completed in 1β2 days depending on size and preparation required.
When is the best time to install turf?
Spring and autumn are ideal, but turf can be laid almost year-round if conditions are suitable.
Do I need to water new turf every day?
Yes, for the first 10β14 days consistent watering is vital. After roots establish, watering can be reduced.
How soon can I mow my new lawn?
Once the grass reaches about 5β7cm, usually after 2β3 weeks, you can mow lightly with sharp blades.
Can I install turf myself?
DIY is possible, but hiring professionals ensures correct preparation, even laying, and long-lasting results.